Commissioning and operation
1. Please check before debugging for the first time:
2. Ensure that wiring is in accordance with manual instructions and electrical regulations.
3. Ensure that all bolts are tightened without looseness.
4. Confirm that the interface is not loose.
5. Check all protective devices.
6. Ensure the conveyor. Heaven and man in the danger zone.
According to the instructions, connect the wire, turn on the power, pay attention to the flashing of the LED light, and continue after confirming that it is correct. If it is internal speed regulation, turn the knob to first gear, observe whether it is running normally, and adjust to high gear after normal.

Measures in case of accident or malfunction
1. Stop the conveyor immediately and turn off the power.
2. In case of accident, take emergency measures and call emergency telephone.
3. Check the instructions.
4. Notify relevant personnel and ask professionals to troubleshoot.

Warranty
Non-normal use, man-made damage or disassembly are not covered by the warranty. Maintenance and inspection
1. Just turn off the power (within 30 seconds), do not touch the connection terminals of the driver card, it is easy to cause electric shock due to residual voltage. 2. Regularly check the driver card and wire for damage.
3. Check the driver card once a year.